The proposed data center site is 638 acres, most of which is active farmland, in Bedington, Berkeley County, WV. This site is situated within thousands of acres of farmland along the Opequon Creek within the Potamac River Basin. It is encircled by over 550 acres of farmland protected forever under conservation easements and within a close proximity of historic sites, nature preserves, schools, and residential communities.


How was this project approved?

The project in Bedington was announced as the first HB2014 certified High Impact Data Center (HIDC) on February 26, 2025 during a press conference at the West Virginia State Capital in Charleston. The event included Gov. Morrisey, state and local government officials, and representatives of Penzance (the real estate firm that plans to develop the project and lease the space to an undisclosed tenant). Local planning officials have stated that they were not involved with project approval and only learned about it a few days prior to the announcement.


Documented

  • Location: Berkeley County, WV on farmland in Bedington near the intersection of Bedington Road, Scrabble Road, and Berkeley Station Road.
  • Acreage: 637.2 acres
  • Developer: Penzance (Washington DC based real estate firm)
    • Managing partner and founder: Victor Tolkan
  • Project LLCs:
  • IT Load: over 600 MW
  • Estimated Temporary Jobs: 1000+
  • Estimated Permanent Jobs: 125+ (90k-110k each)
  • From the WVDEP NPDES Storm Water Permit Application:
    • Data center campus of about 637.2 acres (up from original plans of 550 acres)
    • Multiple data center buildings with electrical infrastructure, cooling systems, access roads, security buildings, utility connections, water treatment facilities, and stormwater management improvements
    • Initial grading will include 430.92 acres of disturbed land that will create about 1,000,000 cubic yards of fill. A borrow pit will be positioned north of Hoke Run along Mouth of Opequon Road. Rock removal will involve heavy ripping and possibly blasting.
    • Runoff drains to Hoke Run and Opequon Creek, then the Potomac. The site has wetlands, streams, nearby springs, and private wells, but no groundwater sampling data. The application is still under DEP review and will go to public notice with a comment period before approval.

Not disclosed

  • Utility power load study
  • Estimated average and peak water usage
  • Water source and withdrawl location
  • Impact studies and mitigation measures
  • Cooling technology
  • Server base
  • Tenant

Site Map

Tick the boxes to turn each site's boundary on and off. The map stays where you have left it; toggling a site only adds or removes its outline. Disclaimer:

Layers

The map has not loaded. The site boundaries are described in the note below.

Loading maps…

Bedington Project site boundries were obtained from files sumitted with the WVDEP NPDES permit application. Farmland and protected farmland site boundaries were retrieved from https://www.mapwv.gov/parcel/. All site boundaries are approximate. Notice a missing farm or protected parcel? Let us know and we will add it.

The site today

The following photos were taken of the parcels selected for the proposed Bedington Project. The area is predominately farmland, including hundreds of acres of protected land on the site boundry. Photos were taken by Nick Brathwaite.

Photo 1 (bedington)
Photo 2 (bedington)
Photo 3 (bedington)
Photo 4 (bedington)

Timeline

Timeline of Bedington Project events, February 2025 to November 2026. Each event is described below.

Use the scrollbar to view the full timeline.

  1. Novemeber 5, 2025: Penzance Properties LLC completed the first purchase and sale agreement (5 total)
  2. Novemeber 17, 2025: Bedington Owner LLC, a subsidary of Penzance, registered to do business in West Virginia
  3. February 26, 2026: Governor Morissey announced the Penzance project in Bedington, WV as the first HB2014 certified High Impact Data Center
  4. July 21, 2026: Bedington Owner LLC submitted an NPDES/State storm water construction permit with the WVDEP (Permit No.: WVR113565). The application is still under review. A public comment period is expected soon. Stay tuned!
  5. September 12, 2026: Eastern Pandhandle United hosted a panel discussion about data center development in the Eastern Panhandle. The panel consisted of political candidates, environmental experts, and community activists. Invitations were extended to the state Data Center office, developers for Penzance and QTS, and incumbant elected officials who voted for HB 2014, however, these parties declined to send representative to join the panel. A video of the dicussion is forthcoming.
  6. September 21, 2026: Berkeley County Comprehensive Plan was approved by the Berkeley County Planning Commission. The plan designates the area where the Bedington Project is proposed as Sustain/Conserve.
  7. October 22, 2026: The Berkeley County Commission will held a public hearing and took public comments on the draft Comprehensive Plan.

NOTE: There was no public notice prior to certification, and local county officials have stated they found out only days prior